Of the 5,627 housing units Morgan City recorded at the 2020 census, some are let to tenants. For the owner or manager of one of those, the walls are usually the largest item on the turnover list after cleaning. This guide sets out how to look at move-out damage, when a patch is enough and when a wall needs more, and how to fit drywall work into the short window while a unit stands empty.
01 Inspect the vacant rooms under a raking light
Damage hides in a furnished room. Once the unit is empty, hold a work light or a phone torch flat against each wall so the beam rakes across the surface. Anchor holes, dents, scuffs that broke the paper, and earlier patches that were never sanded all throw a shadow. Mark each spot with painter's tape and note it room by room. Photograph every wall with the date, which helps later when you go over the deposit.
Look low in bathrooms and closets as well. Board that is soft near a tub, behind a toilet or beside an AC closet suggests a leak, which calls for different work than cosmetic marks.
02 Sort each mark into one of three piles
- Touch-up only. Scuffs and marks where the paper is intact. Clean, spot-prime if needed, and paint.
- Patch. Holes from anchors and nails, nail pops, doorknob holes, crushed corners. These need compound, sanding and primer before paint. The page on patching holes, cracks and corners explains each kind.
- Open up. Soft, stained or swollen board, which usually means water. That board comes out and new board goes in after the cause has been put right, as described on the page about water-damaged drywall in Morgan City.
03 Patch and touch up, or repaint the wall
Dabbing fresh paint over a patch succeeds only when the wall paint is fairly new and you know precisely which color and finish it is. Older flat paint fades, and satin or eggshell shows a dull square wherever new paint meets old. As a rule of thumb, if a wall has more than a couple of patches, or nobody kept a record of the paint, repainting that wall from corner to corner gives a more even result than dabbing at each spot. Keeping a single color and sheen across all rental units makes later turnovers far simpler.
Do not skip primer. New compound takes up paint at its own rate, so a patch painted straight over tends to reappear as a flat, dull shape under the new color.
04 Scheduling repairs in the gap between leases
The usual order is repairs first, then paint, then cleaning, then any new flooring or carpet cleaning last, since sanding dust settles on everything. A small patch set with quick-hardening compound may be finished in one stretch of work, but larger ones wait on each coat to cure. Morgan City's humid subtropical climate slows that drying, so allow an extra day for anything bigger than a doorknob hole. Keeping the air conditioning running in a vacant unit helps compound dry and keeps humidity down while the unit sits empty.
Labor Day weekend brings the Louisiana Shrimp and Petroleum Festival to town, and some owners like to have units ready before that busy weekend. Whatever the date, arranging the drywall estimate as soon as the move-out walk is done gives the most room for drying time and paint.
05 Arranging the repair
A list of spots by room, with a few photos, is the most useful thing to have ready when you call. Grouping every patch in a unit into one job is usually more economical than handling them one by one. Please mention whether the unit is vacant and how the pro can get in, and whether painting should be included in the estimate.